Factory Acceptance Checks Before Export Shipment

Clarify pressure testing, motion checks, documentation and packing handoff before export shipment.

For export projects, acceptance needs more than a machine nameplate. Buyers need a clear handoff across performance, controls, documents and shipment preparation.

Where this helps

Best when the machine scope is close to order confirmation and the buyer needs a pre-shipment test checklist.

What to check

  • Pressure, stroke, daylight and motion checks against the agreed scope.
  • Control panel, safety device, recipe, interlock and operating mode review.
  • Voltage, language, spare parts and documentation package confirmation.
  • Packing, loading, shipping marks and destination-specific requirements.

Inputs to prepare

  • Acceptance standard, test material or test procedure if available.
  • Control, safety, documentation and language expectations.
  • Packing, loading, shipping mark and destination handoff requirements.

Agreeing these checks before shipment reduces ambiguity during installation and commissioning.